NDIS support item · 2026-27
MHM - Toilet Replacement
Quick cost calculator
Claiming rules at a glance
About this NDIS support item
The NDIS pricing guide for toilet replacement under the Home Modifications category outlines the costs associated with modifying or replacing toilets to enhance accessibility for participants. These modifications are tailored to meet individual needs as outlined in each participant's NDIS plan and goals.
Examples
Examples of toilet replacement modifications may include:
- Installing a toilet with a higher seat for easier access.
- Adding grab rails for support.
- Modifying the layout to improve accessibility.
Frequently asked questions
What is included in the toilet replacement support?
Toilet replacement support includes modifications to enhance accessibility, such as installing higher toilets or adding grab rails, based on individual needs.
How is the cost determined for toilet replacement?
Costs for toilet replacement are determined by the specific modifications needed as outlined in the participant's NDIS plan and goals.
Do I need to provide a quote for toilet replacement?
No, a quote is not required for toilet replacement under the NDIS pricing guide.
Can I cancel a toilet replacement service?
Cancellations for toilet replacement services do not incur short notice fees.
Are travel costs included in the toilet replacement support?
No, provider travel costs are not included in the toilet replacement support.
Complete support item details
06_182495413_0111_2_2Source: NDIS Support Catalogue 2026-27 v1.1. Prices are maximum price limits — providers and participants can agree on a lower price. Always check the official NDIS Pricing Arrangements.
Related support items
| Item number | Support item | Unit | National | Remote | Very remote |
|---|---|---|---|---|---|
06_123615401_0111_2_2 | HM - Ceiling Hoist | Each | Quote | Quote | Quote |
06_180000111_0111_2_2 | HM Rental - Bathroom Toilet Ramp | Each | $1.00 | $1.00 | $1.00 |
06_182100401_0111_2_2 | MHM - Electrical and Door Automation | Each | $1.00 | $1.00 | $1.00 |
06_182409401_0111_2_2 | MHM - External Door | Each | $1.00 | $1.00 | $1.00 |
06_182409402_0111_2_2 | MHM - Internal Door | Each | $1.00 | $1.00 | $1.00 |
06_182415401_0111_2_2 | MHM - Flooring | Each | $1.00 | $1.00 | $1.00 |
06_182488377_0111_2_2 | HM - Bathroom/Toilet - Structural work | Each | Quote | Quote | Quote |
06_182488378_0111_2_2 | HM - Kitchen or Laundry - Structural Work | Each | Quote | Quote | Quote |
06_182490112_0111_2_2 | HM - Building Works Project Management | Each | Quote | Quote | Quote |
06_182495121_0111_2_2 | CHM - Deposit | Each | Quote | Quote | Quote |
06_182495221_0111_2_2 | CHM - Progress Stage | Each | Quote | Quote | Quote |
06_182495321_0111_2_2 | CHM - Practical Completion | Each | Quote | Quote | Quote |
